The recommended detention period for grit chambers is_______________?

(A) 1 minute

(B) 2 minutes

(C) 3 minutes

(D) 5 minutes

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


The design period of sewage treatment works in normally_________________?

(A) 5 – 10 years

(B) 15 – 20 years

(C) 30 – 40 years

(D) 40 – 50 years

Submitted By: Ali Uppal


Oxidation process results in the formation of___________________?

(A) Carbon dioxide

(B) Nitrates

(C) Sulphates

(D) All the above

Submitted By: Ali Uppal


The sewerage system consists of______________________?

(A) House sewer

(B) Lateral sewer

(C) Branch sewer

(D) All of these

Submitted By: Ali Uppal


The minimum diameter of sewer to be adopted is_________________?

(A) 10 cm

(B) 12.5 cm

(C) 15 cm