Civil Engineering Mcqs

Setting out the alignments of sewers may start from__________________?

(A) City

(B) Out-fall

(C) Tail end

(D) Any point

Submitted By: Ali Uppal


The most widely used pump for lifting sewage is_________________?

(A) Centrifugal pump

(B) Reciprocating pump

(C) Pneumatic ejector

(D) Air pressure pump

Submitted By: Ali Uppal


Lead caulked joints are used for laying____________________?

(A) Stone ware pipes

(B) Earthenware pipes

(C) C.I. pipes

(D) G.I. pipes

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The pH value of fresh sewage is usually ______________________?

(A) Equal to 7

(B) More than 7

(C) Less than 7

(D) Equal to zero

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The sewer pipes__________________?

(A) Carry sewage as gravity conduits

(B) Are designed for generating self-cleansing velocities at different discharge

(C) Should resist the wear and tear caused due to abrasion

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The temperature affects the________________?

(A) Biological activity of bacteria in sewage

(B) Solubility of gases in sewage

(C) Viscosity of sewage

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal