Civil Engineering Mcqs

A pre-cast pile generally used, is______________?

(A) Circular

(B) Square

(C) Octagonal

(D) Square with corners chamfered

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The minimum thickness of a flat slab is taken_________________?

(A) L/32 for end panels without drops

(B) L/36 for end panels without drops

(C) L/36 for interior panels without drop

(D) All the above

Submitted By: Ali Uppal


The neutral axis of a T-beam exists_________________?

(A) Within the flange

(B) At the bottom edge of the slab

(C) Below the slab

(D) All the above

Submitted By: Ali Uppal


In the zone of R.C.C. beam where shear stress is less than 5 kg/cm2, nominal reinforcement is provided at a pitch of________________?

(A) One -half lever arm of the section

(B) One-third lever arm of the section

(C) Lever arm of the section

(D) One and half lever arm of the section

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The transverse reinforcements provided at right angles to the main reinforcement_______________?

(A) Distribute the load

(B) Resist the temperature stresses

(C) Resist the shrinkage stress

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


After pre-stressing process is completed, a loss of stress is due to______________?

(A) Shrinkage of concrete

(B) Elastic shortening of concrete

(C) Creep of concrete

(D) All the above

Submitted By: Ali Uppal