Civil Engineering Mcqs

Circular section of tunnels is not suitable for________________?

(A) carrying water

(B) non-cohesive soils

(C) tunnels driven by shield method

(D) placement of concrete lining

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Which of the following is not a component of the shield ?

(A) propelling jacks

(B) liner plate

(C) hood

(D) tail

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


In Belgium method of tunneling _________________?

(A) construction of side walls is completed before invert and roof arch are built

(B) construction of roof arch is completed before side walls and invert are built

(C) construction of invert is completed before side walls and roof arch are built

(D) construction of invert and side walls is completed before roof arch is built

Submitted By: Ali Uppal


Drift method of tunnelling is used to construct tunnels in__________________?

(A) soft grounds

(B) rock

(C) self supporting grounds

(D) broken grounds

Submitted By: Ali Uppal


Which one of the following is a component of a shield for tunnelling ?

(A) liner plate

(B) trench jack

(C) stiffener

(D) cutting edge

Submitted By: Ali Uppal


Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?

(A) It is suitable for construction in unstable rocks

(B) In this method, it is easy to install timber support

(C) Tunnelling can be continuous and the work can be expedited

(D) In case of excessive water, it is easy to take correct steps

Submitted By: Ali Uppal


Submitted By: Ali Uppal