Electrical Engineering Mcqs

Which of the following power plants need the least period for installation ?

(A) Thermal power plant

(B) Diesel power plant

(C) Nuclear power plant

(D) Hydro-electric power plant

Submitted By: Ali Uppal


In case of _________ fuel transportation is the major problem.

(A) diesel power plants

(B) nuclear power plants

(C) hydro-electric power plants

(D) thermal power plants

Submitted By: Ali Uppal


___________ is invariably used as base load plant.

(A) Diesel engine plant

(B) Nuclear power plant

(C) Gas turbine plant

(D) Pumped storage plant

Submitted By: Ali Uppal


_________offers the highest electric load.

(A) Television set

(B) Toaster

(C) Vacuum cleaner

(D) Washing machine

Submitted By: Ali Uppal


Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?

(A) firm power

(B) cold reserve

(C) hot reserve

(D) spinning reserve

Submitted By: Ali Uppal


Which of the following plants is almost inevitably used as base load plant?

(A) Diesel engine plant

(B) Gas turbine plant

(C) Nuclear power plant

(D) Pumped storage plant

Submitted By: Ali Uppal


An over excited synchronous motor on no load is known as__________?

(A) synchronous condenser

(B) generator

(C) induction motor

(D) alternator

Submitted By: Ali Uppal


Which of the following source of power is least reliable?

(A) Solar energy

(B) Geothermal power

(C) Wind power

(D) iMHD

Submitted By: Ali Uppal


Which of the following is not a method for estimating depreciation charges?

(A) Sinking fund method

(B) Straight line method

(C) Diminishing value method

(D) Halsey’s 50—50 formula

Submitted By: Ali Uppal


For a diesel generating station the useful life is expected to be around_________Years?

(A) 15 to 20 years

(B) 20 to 50 years

(C) 50 to 75 years

(D) 75 to 100 years

Submitted By: Ali Uppal