Which of the following D.C. distribution system is the simplest and lowest in first cost ?

(A) Radial system

(B) Ring system

(C) Inter-connected system

(D) None of the above

Submitted By: Ali Uppal


Due to which of the following reasons the cables should not be operated too hot ?

(A) The oil may loose its viscosity and it may start drawing off from higher levels

(B) Expansion of the oil may cause the sheath to burst

(C) Unequal expansion may create voids in the insulation which will lead to ionization

(D) The thermal instability may rise due to the rapid increase of dielectric losses with temperature

(D) All of the above

Submitted By: Ali Uppal


Which of the following methods is used for laying of underground cables ?

(A) Direct laying

(B) Draw-in-system

(C) Solid system

(D) All of the above

Submitted By: Ali Uppal


The operating voltage of extra high tension cables is upto_______________?

(A) 6.6 kV

(B) 11 kV

(C) 33 kV

(D) 66 kV

(D) 132 kV

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


In transmission lines the cross-arms are made of________________?

(A) copper

(B) wood

(C) R.C.C.

(D) steel

Submitted By: Ali Uppal


The power factor of industrial loads is generally______________?

(A) unity

(B) lagging

(C) leading

(D) zero