The maximum length of a screw conveyer is about___________?

(A) 30 metres

(B) 40 metres

(C) 60 metres

(D) 100 metres

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Pipes carrying steam are generally made up of_____________?

(A) steel

(B) cast iron

(C) copper

(D) aluminium

Submitted By: Ali Uppal


Method which is commonly applied for unloading the coal for small power plant is___________?

(A) lift trucks

(B) coal accelerators

(C) tower cranes

(D) belt conveyor

Submitted By: Ali Uppal


Load carrying capacity of belt conveyor is about___________?

(A) 20 to 40 tonnes/hr

(B) 50 to 100 tonnes/hr

(C) 100 to 150 tonnes/hr

(D) 150 to 200 tonnes/hr

Submitted By: Ali Uppal


In coal preparation plant, magnetic separators are used to remove___________?

(A) dust

(B) clinkers

(C) iron particles

(D) sand

Submitted By: Ali Uppal


Secondary air is the air used to______________?

(A) reduce the flame length

(B) increase the flame length

(C) transport and dry the coal

(D) provide air round the burners for getting optimum combustion