What does symbol ‘V’ employ in work study________________?
(A) operation
(B) inspection
(C) delay/ temporary Storage
(D) permanent storage
(D) none of the above
String diagram is used when__________________?
(A) team of workers is working at a place
(B) material handling is to be done
(C) idle time is to be reduced
(D) all of the above
(D) none of the above
Micromotion study is__________________?
(A) enlarged view of motion study
(B) analysis of one stage of motion study
(C) minute and detailed motion study
(D) subdivision of an operation into therbligs and their analysis
(D) motion study of small components upto mirco-seconds
The allowed time for a job equals standard time plus___________________?
(A) policy allowance
(B) interference allowance
(C) process allowance
(D) learning allowance
(D) unforeseen allowance
The standard time for a job is_________________?
(A) total work content
(B) base time + relaxation time
(C) total work content + basic time
(D) total work content + delay contingency allowance
(D) total work content + relaxation time
Scheduling gives information about____________________?
(A) when work should start and how much work should be completed during a certain period
(B) when work should complete
(C) that how idle time can be minimized
(D) proper utilisation of machines
(D) none of the above
Choose the wrong statement Time study is used to_________________?
(A) determine overhead expenses
(B) provide a basis for setting piece prices or incentive wages
(C) determine standard costs
(D) determine the capability of an operator to handle the number of machines
(D) compare alternative methods
Micro motion study is__________________?
(A) analysis of a man-work method by using a motion picture camera with a timing device in the field of view
(B) motion study* observed on enhanced time intervals
(C) motion study of a sequence of operations conducted systematically
(D) study of man and machine conducted simultaneously
(D) scientific, analytically procedure for determining optimum work method
TMU in method time measurement stands for__________________?
(A) time motion unit
(B) time measurement unit
(C) time movement unit
(D) technique measurement unit
(D) time method unit
Slack represents the difference between the___________________?
(A) latest allowable time and the normal expected time
(B) latest allowable time and the earliest expected time
(C) proposed allowable time and the earliest expected time
(D) normal allowable time and the latest expected time
(D) project initiation tune and actual starting time