Software Engineering Mcqs

Which of the following is included in SRS ?

(A) Cost

(B) Design Constraints

(C) Staffing

(D) Delivery Schedule

Submitted By: Ali Uppal


Arrange the given sequence to form a SRS Prototype outline as per IEEE SRS Standard?

(A) iii, i, ii,v, iv

(B) iii, ii, i, v, iv

(C) ii, i, v, iv, iii

(D) iii, i, ii

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Which of the following is not a Requirement Management workbench tool ?

(A) RTM

(B) DOORS

(C) Rational Suite

(D) RDD 100

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Which of the following is a requirement management activity ?

(A) Investigation

(B) Design

(C) Construction and Test

(D) All of the mentioned

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


How is CORE different from IBIS ?

(A) Iterative in nature

(B) Redundancies are removed

(C) It is simple and an easier method to use

(D) Consistency problems are addressed in CORE

Submitted By: Ali Uppal