Software Engineering Mcqs

CO policy in CMM means___________________?

(A) The leadership practices in Commitment to Perform

(B) The organizational structure (groups) practices in Ability to Perform

(C) The policy practices in Commitment to Perform

(D) The planning practices in Commitment to Perform

Submitted By: Ali Uppal


Which of the following is not a maturity level in CMM ?

(A) Design

(B) Repeatable

(C) Managed

(D) Optimizing

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Which of the following is not a SQA plan for a project ?

(A) evaluations to be performed

(B) amount of technical work

(C) audits and reviews to be performed

(D) documents to be produced by the SQA group

Submitted By: Ali Uppal


Which of the following is not a part of process change ?

(A) Introducing new practices, methods or processes

(B) Introducing new team members to existing project

(C) Introducing or removing deliverable

(D) Introducing new roles or responsibilities

Submitted By: Ali Uppal


In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?

(A) Software Product Engineering

(B) Software Quality Assurance

(C) Software Subcontract Management

(D) Software Quality Management

Submitted By: Ali Uppal


The CMM emphasizes____________________?

(A) continuous process improvement

(B) the need to record information

(C) the need to accept quality system

(D) none of the mentioned

Submitted By: Ali Uppal


ISO 9001 is not concerned with _______________ of quality records?

(A) collection

(B) maintenance

(C) verification

(D) dis-positioning

Submitted By: Ali Uppal


CMM stands for_____________________?

(A) Capability Management Module

(B) Conservative Maturity Model

(C) Capability Maturity Module

(D) Capability Maturity Model

Submitted By: Ali Uppal