CO policy in CMM means___________________?
(A) The leadership practices in Commitment to Perform
(B) The organizational structure (groups) practices in Ability to Perform
(C) The policy practices in Commitment to Perform
(D) The planning practices in Commitment to Perform
Which of the following is not a maturity level in CMM ?
(A) Design
(B) Repeatable
(C) Managed
(D) Optimizing
Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
(A) CMM
(B) ISO 9001
(C) ISO 9000-3
(D) None of the mentioned
____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
(A) ISO 9001
(B) ISO 9000-4
(C) CMM
(D) All of the mentioned
Which of the following is not a SQA plan for a project ?
(A) evaluations to be performed
(B) amount of technical work
(C) audits and reviews to be performed
(D) documents to be produced by the SQA group
Which of the following is not a part of process change ?
(A) Introducing new practices, methods or processes
(B) Introducing new team members to existing project
(C) Introducing or removing deliverable
(D) Introducing new roles or responsibilities
In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
(A) Software Product Engineering
(B) Software Quality Assurance
(C) Software Subcontract Management
(D) Software Quality Management
The CMM emphasizes____________________?
(A) continuous process improvement
(B) the need to record information
(C) the need to accept quality system
(D) none of the mentioned
ISO 9001 is not concerned with _______________ of quality records?
(A) collection
(B) maintenance
(C) verification
(D) dis-positioning
CMM stands for_____________________?
(A) Capability Management Module
(B) Conservative Maturity Model
(C) Capability Maturity Module
(D) Capability Maturity Model