Which of the following describes”Is-a-Relationship” ?
(A) Aggregation
(B) Inheritance
(C) Dependency
(D) All of the mentioned
MTTC falls the the category of____________________?
(A) correctness
(B) integrity
(C) maintainability
(D) all of the mentioned
The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio ?
(A) maximum number of nodes at any level
(B) longest path from the root to a leaf
(C) number of modules
(D) lines of control
Percentage of modules that were inspected is a part of__________________?
(A) Product Metrics
(B) Process Metrics
(C) Project Metrics
(D) All of the mentioned
Identify the correct option with reference to Software Quality Metrics ?
(A) Integrity = [Sigma(1 – threat)] * (1 – security)
(B) Integrity = [1 – Sigma(threat)] * (1 – security)
(C) Integrity = [1 – threat * Sigma(1 – security)]
(D) Integrity = Sigma[1 – threat * (1 – security)]
Usability in metric analysis is defined as the degree to which the software_________________?
(A) stated needs
(B) is easy to use
(C) makes optimal use of system resources
(D) none of the mentioned
Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
(A) travel and training costs
(B) hardware and software costs
(C) effort costs (the costs of paying software engineers and managers)
(D) all of the mentioned
Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?
(A) Project size
(B) Planning process
(C) Project complexity
(D) Degree of structural uncertainty
Quality planning is the process of developing a quality plan for__________________?
(A) team
(B) project
(C) customers
(D) project manager
The process each manager follows during the life of a project is known as ___________________?
(A) Project Management
(B) Manager life cycle
(C) Project Management Life Cycle
(D) All of the mentioned