Which level of CMM is for process management ?
(A) Initial
(B) Repeatable
(C) Defined
(D) Optimizing
Software reliability is defined with respect to____________________?
(A) time
(B) bugs
(C) failures
(D) quality
Failure In Time (FIT) is another way of reporting __________________?
(A) MTTR
(B) MTTF
(C) MTSF
(D) MTBF
In ISO 9126, time behavior and resource utilization are a part of___________________?
(A) maintainability
(B) portability
(C) efficiency
(D) usability
MTTF stands for___________________?
(A) Minimum time to failure
(B) Mean time to failure
(C) Maximum time to failure
(D) None of the mentioned
Which of the following is not a Probabilistic Model ?
(A) Error seeding
(B) NHPP
(C) Input domain
(D) Halstead’s software metric
IMC Networks is a leading __________________ certified manufacturer of optical networking and LAN/WAN connectivity solutions for enterprise, telecommunications and service provider applications ?
(A) Telco Systems
(B) D-Link
(C) Arista Networks
(D) ISO 9001
Unit testing is done by__________________?
(A) Users
(B) Developers
(C) Customers
(D) None of the mentioned
Which of the following is non-functional testing ?
(A) Black box testing
(B) Performance testing
(C) Unit testing
(D) None of the mentioned
Testing done without planning and Documentation is called_________________?
(A) Unit testing
(B) Regression testing
(C) Adhoc testing
(D) None of the mentioned