Civil Engineering Mcqs

Submitted By: Ali Uppal


Bottom most layer of pavement is known as_____________?

(A) wearing course

(B) base course

(C) sub-base course

(D) subgrade

Submitted By: Ali Uppal


For rapid curing cutbacks, the oil used is______________?

(A) gasoline

(B) kerosene oil

(C) light diesel

(D) heavy diesel

Submitted By: Ali Uppal


RC-2, MC-2 and SC-2 correspond to_______________?

(A) same viscosity

(B) viscosity in increasing order from RC-2 to SC-2

(C) viscosity in decreasing order from RC-2 to SC-2

(D) none of the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?

(A) dry rolling, wet rolling, application of screening and application of filler

(B) dry rolling, application of filler, wet rolling and application of screening

(C) dry rolling, application of screening, wet rolling and application of filler

(D) dry rolling, application of screening, application of filler and wet rolling

Submitted By: Ali Uppal


The binder normally used in flexible pavement construction is________________?

(A) cement

(B) lime

(C) bitumen

(D) none of the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Maximum daily traffic capacity of bituminous pavements is______________?

(A) 500 tonnes per day

(B) 1000 tonnes per day

(C) 1500 tonnes per day

(D) 2000 tonnes per day

Submitted By: Ali Uppal