A river training work is generally required when the river is_______________?

(A) aggrading type

(B) degrading type

(C) meandering type

(D) both (A) and (B)

Submitted By: Ali Uppal


Lining of irrigation channels________________?

(A) increases the waterlogging area

(B) decreases the waterlogging area

(C) does not change the water logging area

(D) none of the above

Submitted By: Ali Uppal


The net speed under which the turbine reaches its peak efficiency is called_________________?

(A) design speed

(B) rated speed

(C) gross speed

(D) operating speed

Submitted By: Ali Uppal


Submitted By: Ali Uppal


A hydroelectric scheme operating under a head of 80 m will be classified as_____________?

(A) low head scheme

(B) medium head scheme

(C) high head scheme

(D) none of the above

Submitted By: Ali Uppal


Generally the weir is aligned at right angles to the direction of the main river current because______________?

(A) it ensures less length of the weir

(B) it gives better discharging capacity

(C) it is economical

(D) all of the above

Submitted By: Ali Uppal


A divide wall is provided_______________?

(A) at right angle to the axis of weir

(B) parallel to the axis of weir and up-stream of it

(C) parallel to the axis of weir and down-stream of it

(D) at an inclination to the axis of weir

Submitted By: Ali Uppal


Silt excluders are constructed on the________________?

(A) river bed upstream of head regulator

(B) river bed downstream of head regulator

(C) canal bed upstream of head regulator

(D) canal bed downstream of head regulator