Civil Engineering Mcqs

Submitted By: Ali Uppal


A hyetograph is a graphical representation of___________________?

(A) rainfall intensity and time

(B) rainfall depth and time

(C) discharge and time

(D) cumulative rainfall and time

Submitted By: Ali Uppal


A runoff river plant_________________?

(A) is a medium head scheme

(B) generates power during peak hours only

(C) is suitable only on a perennial river

(D) has no pondage at all

Submitted By: Ali Uppal


A runoff river plant is____________?

(A) a low head scheme

(B) a medium head scheme

(C) a high head scheme

(D) none of the above

Submitted By: Ali Uppal


A river bend characterized by silting_______________?

(A) scouring on concave side

(B) silting on convex side

(C) scouring on convex side and on concave side

(D) scouring on concave side and silting on convex side

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ?

(A) slope-area method

(B) area-velocity method

(C) moving boat method

(D) ultra-sonic method

Submitted By: Ali Uppal


The stream which does not have any base flow contribution is called________________?

(A) perennial stream

(B) intermittent stream

(C) ephemeral stream

(D) none of the above

Submitted By: Ali Uppal


If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that______________?

(A) demand cannot be met by inflow

(B) reservoir was not full at the beginning

(C) both (A) and (B)

(D) none of the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal