Civil Engineering Mcqs

The rate of payment is made for 100 cu m (per % cu m) in case of__________________?

(A) Earth work in excavation

(B) Rock cutting

(C) Excavation in trenches for foundation

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


Submitted By: Ali Uppal


In the mid-section formula__________________?

(A) The mean depth is the average of depths of two consecutive sections

(B) The area of mid-sections is calculated by using mean depth

(C) The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections

(D) All of the above

Submitted By: Ali Uppal


The cross -sections for a highway is taken at_________________?

(A) Right angle to the centre line

(B) 30 metres apart

(C) Intermediate points having abrupt change in gradient

(D) All the above

Submitted By: Ali Uppal


According to Indian Standards Institute, the actual size of modular bricks is_______________?

(A) 23 cm × 11.5 cm × 7.5 cm

(B) 25 cm × 13 cm × 7.5 cm

(C) 19 cm × 9 cm × 9 cm

(D) 20 cm × 10 cm × 10 cm

Submitted By: Ali Uppal


Pick up the excavation where measurements are made in square metres for payment ?

(A) Ordinary cuttings up to 1 m

(B) Surface dressing up to 15 cm depths

(C) Surface excavation up to 30 cm depths

(D) Both

Submitted By: Ali Uppal


In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?

(A) Breadth of the wall

(B) Half breadth of wall on each side

(C) One fourth breadth of wall on each side

(D) None of these

Submitted By: Ali Uppal


The area is measured correct to the nearest___________________?

(A) 0.01 sqm

(B) 0.02 sqm

(C) 0.03 sqm

(D) 0.04 sqm

Submitted By: Ali Uppal