Civil Engineering Mcqs

Submitted By: Ali Uppal


As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?

(A) 1.80 litres for 5 to 10 users

(B) 1.20 litres for 15 users

(C) 1.35 for 20 users

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?

(A) b – rd)²/(r – s)

(B) b – rd)²/(r + s)

(C) ½ × (b + rd)²/(r – s)

(D) b – rd)²/(s – r)

Submitted By: Ali Uppal


For the construction of buildings, the subheads of the estimate are________________?

(A) Earthwork, Concrete work, Brick work

(B) Brickwork, Stone work, Roofing

(C) Brickwork Flooring, Wood work, Steel work

(D) All the above

Submitted By: Ali Uppal


Cost of fittings and their fixing is specified for the following sanitary fittings________________?

(A) Water closets

(B) Flushing pipes

(C) Lavatory basins

(D) All the above

Submitted By: Ali Uppal


Submitted By: Ali Uppal


The item of the brick structure measured in sq.m, is___________________?

(A) Reinforced brick work

(B) Broken glass coping

(C) Brick edging

(D) Brick work in arches

Submitted By: Ali Uppal


According to ISI method of measurement, the order of the sequence is_________________?

(A) Length, breadth, height

(B) Breadth, length, height

(C) Height, length, breadth

(D) None of these

Submitted By: Ali Uppal


The most reliable estimate is_________________?

(A) Detailed estimate

(B) Preliminary estimate

(C) Plinth area estimate

(D) Cube rate estimate

Submitted By: Ali Uppal