While preparing a detailed estimate__________________?
(A) Dimension should be measured correct to 0.01 m
(B) Area should be measured correct to 0.01 sqm
(C) Volume should be measured correct to 0.01 cum
(D) All the above
The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
(A) 2.5 sqm
(B) 5.0 sqm
(C) 7.5 sqm
(D) 10 sqm
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
(A) 2.0 %
(B) 2.5 %
(C) 4.0 %
(D) 5.0 %
The measurement is not made in square metres in case of________________?
(A) D.P.C. (Damp proof course)
(B) Form works
(C) Concrete Jeffries
(D) R.
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
(A) Rs. 400
(B) Rs. 425
(C) Rs. 450
(D) Rs. 500
The trap which is provided to disconnect the house drain from the street sewer is called_________________?
(A) Master trap
(B) Intercepting trap
(C) Interception manhole
(D) All the above
The ‘centre line method’ is specially adopted for estimating_________________?
(A) Circular buildings
(B) Hexagonal buildings
(C) Octagonal buildings
(D) All the above
The inspection pit or chamber is a manhole provided in a base drainage system________________?
(A) At every change of direction
(B) At every change of gradient
(C) At every 30 m intervals
(D) All the above
In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
(A) Setting and laying
(B) Bed concreting
(C) Connection to drains
(D) All of these
Carpet area does not include the area of_________________?
(A) The walls along with doors and other openings
(B) Bath room and lavatory
(C) Kitchen and pantry
(D) All the above